NBCUniversal
Universal City, CA


Size

10,000 SF


Description

Media Center B upgrade in an active data center

  • Phased upgrade (5 years) of the MEPFP systems
  • Hot + cold aisle server cabinet containment pods
  • In-row CRAC units
  • Two (2) 750Kva UPS systsems
  • Two (2) 2MW standby generators with fuel storage system
  • Multiple ATS’s with generator switchgear
  • Two (2) 150-ton closed loop cooling towers
  • Full BMS upgrade
  • Removal of existing halon fire protection system


Architect

Gensler