Upgrade to Tier 4 Data Center

  • Conversion to new systems while in a live/active facility
  • Two (2) 500Kva parallel redundant UPS systems
  • Two (2) 1000 KW standby diesel generators
  • Redundant power distribution at server cabinets
  • Utility services upgrades
  • Parallel switchgear
  • Five (5) 30-ton air cooled CRAC units
  • N+1 redundancy
  • Infrastructure hardening